REQUEST FOR BIDS
Silver Creek Township, Wright County, Minnesota
2022-A Street Overlay Project
NOTICE IS HERE GIVEN that sealed bids will be received at Civil Engineering Site Design, 118 East Broadway Street, PO Box 566, Monticello, MN 55362 until 1:00 PM, Thursday, April 21, 2022, at which time and place the bids will be opened and read aloud, for the furnishing of all labor and material for the construction of the projects with the following estimated quantities:
Bid A-0: Bituminous Wear , 1,943 TN, Mill Bituminous, 240 SY
Bid A-1 (Alternate): Bituminous Base, 2,559 TN, Mill Bituminous 40 SY
The project shall start on or after June 20, 2022 and be fully completed on or before September 02, 2022. Contracts, bonds, and insurance items must be submitted and accepted prior to start of work. No striping is needed. The Silver Creek Township Board reserves the right to reduce or increase the bid quantity by 25% without a change to the bid price. Plans, specifications, and proposal form may be obtained online at www.questcdn.com or at the office of Civil Engineering Site Design upon deposit of Fifty Dollars ($50.00) for each set. This deposit will not be refunded.
Each bid shall be accompanied by a bidder’s bond, certified check or cashier’s check in an amount equal to at least five (5%) percent of the amount of the bid which shall be forfeited to Silver Creek Township in the event the successful bidder fails to enter into a contract within the specified time.
Bids must be marked “2022-A Street Overlay Project” on the outside of the envelope containing the bid. All bids mailed to Civil Engineering Site Design shall be addressed to: Civil Engineering Site Design, 118 East Broadway Street, PO Box 566, Monticello, MN 55362. If mailed, the bid must be enclosed in a separate sealed envelope and marked as aforementioned within the mailing envelope. Faxed or emailed bids shall not be accepted.
The Town Board reserves the right to reject any or all bids and to waive any irregularities in the bidding, and further reserves the right to award the contract to the best interests of the Town.
(28,29,30c)
REQUEST FOR BIDS
Silver Creek Township, Wright County, Minnesota
2022-B Street Seal Coat Project
NOTICE IS HERE GIVEN that sealed bids will be received at Civil Engineering Site Design, 118 East Broadway Street, PO Box 566, Monticello, MN 55362 until 1:00 PM, Thursday, April 21, 2022, at which time and place the bids will be opened and read aloud, for the furnishing of all labor and material for the construction of the projects with the following estimated quantities:
Bid B-0: Asphalt Material CRS-2P, 18,482 GAL, Aggregate FA-2 Class C, 925 TN, Fog Seal CSS-1 or CSS-1h, 7,394 GAL
Bid B-1 (Alternate 1) Asphalt Material CRS-2P, 4,704 GAL, Aggregate FA-2 Class C, 98 TN, Aggregate FA-3 Class C, 137 TN, Fog Seal CSS-1 or CSS-1h, 784 GAL
Bid B-2 (Alternate 2) Asphalt Material CRS-2P, 12,285 GAL, Aggregate FA-2 Class C, 256 TN, Aggregate FA-3 Class C, 358 TN, Fog Seal CSS-1 or CSS-1h, 2,048 GAL
The project shall start on or after June 20, 2022 and be fully completed on or before September 02, 2022. Contracts, bonds, and insurance items must be submitted and accepted prior to start of work. No striping is needed. The Silver Creek Township Board reserves the right to reduce or increase the bid quantity by 25% without a change to the bid price. Plans, specifications, and proposal form may be obtained online at www.questcdn.com or at the office of Civil Engineering Site Design upon deposit of Fifty Dollars ($50.00) for each set. This deposit will not be refunded.
Each bid shall be accompanied by a bidder’s bond, certified check or cashier’s check in an amount equal to at least five (5%) percent of the amount of the bid which shall be forfeited to Silver Creek Township in the event the successful bidder fails to enter into a contract within the specified time.
Bids must be marked “2022-B Street Seal Coat Project” on the outside of the envelope containing the bid. All bids mailed to Civil Engineering Site Design shall be addressed to: Civil Engineering Site Design, 118 East Broadway Street, PO Box 566, Monticello, MN 55362. If mailed, the bid must be enclosed in a separate sealed envelope and marked as aforementioned within the mailing envelope. Faxed or emailed bids shall not be accepted.
The Town Board reserves the right to reject any or all bids and to waive any irregularities in the bidding, and further reserves the right to award the contract to the best interests of the Town.
(28,29,30c)
Assessment Notice
Albion Township
NOTICE IS HEREBY GIVEN, That the Local Board of Appeal and Equalization for TOWNSHIP OF ALBION of Wright County, Minnesota, will meet at the Office of the Clerk in said Township, at 7:00:00 p.m., on Monday, the 11th day of April, 2022. The purpose of this meeting is to determine whether property in the jurisdiction has been properly valued and classified by the assessor.
If you believe the value or classification of your property is incorrect, please contact your assessor’s office to discuss your concerns. If you disagree with the valuation or classification after discussing it with your assessor, you may appear before the local board of appeal and equalization. The board will review your assessments and may make corrections as needed. Generally, you must appeal to the local board before appealing to the county board of appeal and equalization.
Given under my hand this 24th day of March, 2022.
Debbie Uecker
Clerk of the Board of Albion
(28,29c)
PUBLIC Notice
THIS IS A PUBLIC
COMMUNICATION TO ALL Joseph-Carl: Zabel,
sui juris
Notice to agents is
notice to principles All rights reserved UCC 1-308/1-207
Notice to principles is Notice to Agents Howard Lake, Minnesota a republic near (55349)
Applications to all
successors and assigns
Phone (320) 543-3000
All are with excuse
Non-domestic without the United States
Let it be known to all that I, Joseph-Carl: Zabel explicitly reserves all of my rights. See UCC 1-308 which was formally UCC 1-207.
“1-308. Performance or Acceptance Under Reservations of Rights.
(a) A party that with explicit reservation of rights performs or promises performance or assents to performance in a manner demanded or offered by the other party does not thereby prejudice the rights reserved. Such words as “without prejudice,” “under protest,” or the like are sufficient.”
I retained all of my rights and liberties at all times and in all places, nunc pro tunc (now for then) from the time of my birth and forevermore. Further, I retain my rights not be compelled to perform under any contract or commercial agreement that I did not enter knowingly, voluntarily and intentionally. And furthermore, I do not accept the liability of the compelled benefit of any unrevealed contract or commercial agreement. I am not ever subject to silent contracts and have never knowingly or willingly contracted away my sovereignty.
Further, I am not a United States citizen or a 14th amendment citizen. I am a State Citizen of the republic and reject any attempted expatriation. See United States statute at large, July 27th, 1868 also known as the expatriation statute.
Violation fee of my liberty is $250,000 per incident or per 15 minutes or any part thereof. Wherefore all have undeniable knowledge.
AFFIDAVIT
Affiant, Joseph-Carl: Zabel, sui juris, a natural born Citizen of Minnesota in its dejure capacity as a republic and as one of the several states of the union created by the constitution for the United States of American 1777/1789. This incidentally makes me an American national and a common man of the Sovereign People, does swear and affirm that Affiant has scribed and read the foregoing facts, and in accordance with the best of Affiant’s firsthand knowledge and conviction, such are true, correct, complete and not misleading, the truth, the whole truth, and nothing but the truth.
Signed By: Joseph-Carl: Zabel, sui juris, This Affidavit is dated 3-25-22
NOTARY PUBLIC
State: Minnesota County: Wright
Subscribed and sworn to before me, a Notary Public, the above signed Joseph-Carl:Zabel,
This 25th day of March, of the year 2022 (it says 2021 on the form)
Maria A. Becker
Notary Public
MY COMMISSION EXPIRES: January 31, 2025.
(29c)
SUMMARY OF CORINNA TOWNSHIP ORDINANCE 2022-01 (Land Use Ordinance)
NOTICE IS HEREBY GIVEN that the Board of Supervisors of the Township of Corinna, Wright County, Minnesota, have adopted Ordinance 2022-01 (“Land Use Ordinance”), an Ordinance Amending Ordinance 2019-01 effective immediately. Amendments include changes to section 781 (Private/Vacation Home Rental) and Section 506.8 (Fee Schedule) of the Corinna Township Land Use Ordinance. The purpose of the amendments is to regulate the use of private dwellings for short-term rental and to bring Township permit and zoning fees in line with fee changes recently adopted by Wright County. A printed copy of the Ordinance is available for inspection by any person at the office of the Town Clerk, the office of the County Recorder, in the County Law Library, at the Annandale and Maple Lake Public Library and is available on-line for download at www.hometownplanning.com.
Adopted by the Corinna Town Board of Supervisors this 1st day of March 2022.
Larry Smith, Board Chair
Mary Barkley Brown, Clerk
(29c)
CITY OF MAPLE LAKE
ADVERTISEMENT FOR BIDS
Electronic Bids will be received by the City of Maple Lake Minnesota, on the QuestCDN.com website via the VirtuBid electronic bidding application. Only electronic bids will be accepted for this project. Bids will be received on the QuestCDN.com website, until 10:00 A.M. local time on Thursday, April 29, 2022, at which time they will be opened electronically and reviewed for the furnishing of all labor, materials, and all else necessary for the following:
2022 MGG Airport Pavement Maintenance Project
In general, the work consists of the pavement preservation work at the Maple Lake Airport. Work includes crack repair and patching.
Complete digital Bidding Documents are available at www.questcdn.com by inputting QuestCDN eBidDoc #8173893 on the website’s Project Search page. Paper Bidding Documents may also be viewed at the City of Maple Lake City Hall.
Direct inquiries to Engineer’s Project Manager, Phil Gravel, at phil.gravel@Stantec.com. Instructions for viewing the bid opening will be made available through QuestCDN and posted on the City’s website.
Bid Security in the amount of 5 percent of the amount of the Bid must accompany each Bid in accordance with the Instructions to Bidders.
For this project, the City will only accept online electronic bids through QuestCDN. To access the electronic bid, download the project documents and click on the online bidding button at the top of the advertisement. Prospective bidders must be on the plan holders list through QuestCDN for bids to be accepted.
The Owner reserves the right to retain the deposits of the 3 lowest Bidders for a period not to exceed 80 days after the date and time set for the Opening of Bids. No Bids may be withdrawn for a period of 80 days after the date and time set for the Opening of Bids.
The Owner reserves the right to reject any and all Bids, to waive irregularities and informalities therein, and further reserves the right to award the Contract to the best interests of the Owner.
The successful bidder must be a “responsible contractor.” The term “responsible contractor” means a contractor as defined in Minnesota Statutes, section 16C.285, subdivision 3. Any prime contractor, subcontractor, or motor carrier that does not meet the minimum criteria or fails to comply with the verification requirements is not a responsible contractor and is not eligible to be awarded a construction contract for the project or to perform work on the project. A prime contractor, subcontractor, or motor carrier that makes a false statement under oath verifying compliance with the minimum criteria will be ineligible to be awarded a construction contract on the project, and the submission of a false statement may result in termination of a contract awarded to a prime contractor, subcontractor, or motor carrier that submits the false statement. A prime contractor shall include in its verification of compliance a list of all of its first-tier subcontractors that it intends to retain for work on the project. Before execution of a construction contract, a prime contractor shall submit a supplemental verification under oath confirming that all subcontractors and motor carriers that the prime contractor intends to use to perform project work have verified to the prime contractor, through a signed statement under oath by an owner or officer, that they meet the minimum criteria for a responsible contractor.
Renee Eckerly, City Administrator
City of Maple Lake, Minnesota
(29c)